Connect to Microsoft Project Data in Airbyte ELT Pipelines



Use CData Connect Cloud to build ELT pipelines for Microsoft Project data in Airbyte.

Airbyte empowers users to load your data into any data warehouse, data lake, or database. When combined with CData Connect Cloud, Airbyte users can create Extract, Load, Transform (ELT) pipelines directly from live Microsoft Project data. This article illustrates the process of connecting to Microsoft Project through Connect Cloud and constructing ELT pipelines for Microsoft Project data within Airbyte.

CData Connect Cloud offers a dedicated SQL Server interface for Microsoft Project, facilitating data querying without the need for data replication to a native database. With built-in optimized data processing capabilities, CData Connect Cloud efficiently directs all supported SQL operations, including filters and JOINs, straight to Microsoft Project. This harnesses server-side processing to swiftly retrieve the desired Microsoft Project data.

Configure Microsoft Project Connectivity for Airbyte

Connectivity to Microsoft Project from Airbyte is made possible through CData Connect Cloud. To work with Microsoft Project data from Airbyte, we start by creating and configuring a Microsoft Project connection.

  1. Log into Connect Cloud, click Sources, and then click Add Connection
  2. Select "Microsoft Project" from the Add Connection panel
  3. Enter the necessary authentication properties to connect to Microsoft Project.

    The User and Password properties, under the Authentication section, must be set to valid Microsoft Project user credentials. In addition, specify a URL to a valid Microsoft Project server organization root or Microsoft Project services file.

  4. Click Create & Test
  5. Navigate to the Permissions tab in the Add Microsoft Project Connection page and update the User-based permissions.

Add a Personal Access Token

When connecting to Connect Cloud through the REST API, the OData API, or the Virtual SQL Server, a Personal Access Token (PAT) is used to authenticate the connection to Connect Cloud. It is best practice to create a separate PAT for each service to maintain granularity of access.

  1. Click on the Gear icon () at the top right of the Connect Cloud app to open the settings page.
  2. On the Settings page, go to the Access Tokens section and click Create PAT.
  3. Give the PAT a name and click Create.
  4. The personal access token is only visible at creation, so be sure to copy it and store it securely for future use.

With the connection configured and a PAT generated, you are ready to connect to Microsoft Project data from Airbyte.

Connect to Microsoft Project from Airbyte

To establish a connection from Airbyte to CData Connect Cloud, follow these steps.

  1. Log in to your Airbyte account
  2. On the left panel, click Sources, then Add New Source
    • Set Source Type to MSSQL Server to connect the TDS endpoint
    • Set Source Name
    • Set Host URL to tds.cdata.com
    • Set Port to 14333
    • Set Database to the name of the connection you previously configured, e.g. MicrosoftProject1.
    • Set Username to your Connect Cloud username
    • Set SSL Method to Encrypted (trust server certificate), leave the Replication Method as standard, and set SSH Tunnel Method to No Tunnel
    • (Optional) Set Schema to anything you want to apply to the source
    • Set Password to your Connect Cloud PAT
    • (Optional) Enter any needed JBDC URL Params
  3. Click Test and Save to create the data source.

Create ELT Pipelines for Microsoft Project Data

To connect Microsoft Project data with a new destination, click Connections and then Set Up Connection to connect to your destination. Select the source created above and your desired destination, then allow Airbyte to process. When it is done, your connection is ready for use.

Get CData Connect Cloud

To get live data access to 100+ SaaS, Big Data, and NoSQL sources directly from Airbyte, try CData Connect Cloud today!

Ready to get started?

Learn more about CData Connect Cloud or sign up for free trial access:

Free Trial