This article demonstrates how to access Microsoft Project data from PowerBuilder using the Microsoft Project JDBC Driver.
The CData JDBC driver for Microsoft Project is a standards-based control that can be used from any platform or development technology that supports JDBC, including PowerBuilder. This article shows how to use the CData JDBC Driver for Microsoft Project in PowerBuilder.
This article shows how to create a basic PowerBuilder application that uses the CData JDBC Driver for Microsoft Project to perform reads and writes.
Connect to Microsoft Project Data from PowerBuilder
Follow the steps below to use the Database Painter tool to create a database profile based on an JDBC URL for Microsoft Project. You can use a database profile to save connection properties. In the Database Painter, you can graphically manipulate data as well as execute SQL queries.
Add the driver JAR to the PowerBuilder classpath. Set the CLASSPATH system environment variable to the path to the driver JAR, located in the lib subfolder of the installation directory.
Note: If you are using PowerBuilder Classic, you can also add the path to the driver JAR by clicking Tools -> System Options -> Java.
- Click Tools -> Database Painter.
- Right-click the JDBC node and click New Profile.
- In the Database Profile Setup dialog, enter the following:
- Profile Name: Enter a user-friendly name for the profile.
- Driver Name: Enter the class name of the driver, cdata.jdbc.microsoftproject.MicrosoftProjectDriver
- URL: Enter the JDBC URL.
The User and Password properties, under the Authentication section, must be set to valid Microsoft Project user credentials. In addition, specify a URL to a valid Microsoft Project server organization root or Microsoft Project services file.
Built-in Connection String Designer
For assistance in constructing the JDBC URL, use the connection string designer built into the Microsoft Project JDBC Driver. Either double-click the JAR file or execute the jar file from the command-line.
java -jar cdata.jdbc.microsoftproject.jar
Fill in the connection properties and copy the connection string to the clipboard. A typical JDBC URL is below:
jdbc:microsoftproject:User=myuseraccount;Password=mypassword;URL=http://myserver/myOrgRoot;
- To view and modify a table, right-click a table and then click Edit Data -> Grid.
Using Microsoft Project Data with PowerBuilder Controls
You can use standard PowerBuilder objects to connect to JDBC data sources and execute queries. The following example shows how to retrieve Microsoft Project data into a DataWindow. You can add the following code to the open method:
SQLCA.DBMS = "JDBC" SQLCA.AutoCommit = False SQLCA.DBParm = "Driver='cdata.jdbc.microsoftproject.MicrosoftProjectDriver',URL='jdbc:microsoftproject:User=myuseraccount;Password=mypassword;URL=http://myserver/myOrgRoot;"; CONNECT USING SQLCA; dw_projects.SetTransObject(SQLCA); dw_projects.Retrieve();